Category: Fixing the boat

Sweating The Small Stuff, part 1

Sweating The Small Stuff, part 1

In general it seems that there is two things that goes through everything, A) every job takes twice the time you’d think it would and B) googling and buying some missing parts from the other side of the city doubles the time required…

AIS, AIS baby

AIS, AIS baby

Loads of new electronic devices found their way to Liberta this year! A long with the new chart plotter, sending and receiving AIS and a new VHF was installed.

Renewing The Electrics

Renewing The Electrics

The most important job this year was renewing the electrics and installing new equipment. For the job we got help from our friend Timo, without who this job could not have been done.